What are the daily maintenance and equipment operation precautions of the centralized dust collection system?
Notes on daily maintenance and equipment operation of the centralized dust collection system: 1. If the pulse valve fails during the operation of the centralized dust collection system, it should be removed, repaired and replaced in time. If there are impurities and moisture inside the equipment, it should be cleaned in time. If the diaphragm is damaged, it should be replaced in time. 2. The...
0 Comments 0 Shares